Deutsch
Contact Us   |  Sitemap

Home   |  Products   |  Solutions   |  News Center   |  Support   |  About Us

Login | Register

New on the Web
News
Tip of the Month
New Publications
Newsletter
Press
Shows & Events
 
 
SIPLACE SX lowers cost of ownership
Current value analyses prove it: With the new SIPLACE SX you can reduce the cost of ownership for your placement equipment by up to 50 percent. The comparative value analyses prepared by SIPLACE’s tuning experts demonstrate the strengths of the new SIPLACE SX concept on the basis of concrete examples from the high-speed and high-flexibility segments.
The new SIPLACE SX with its trailblazing "Capacity on Demand" concept opens the door to manufacturing concepts that are new, demand-oriented and extremely economical. As part of its Compare campaign, the SIPLACE team makes it easier than ever before to compare the new platform with its predecessors and other manufacturers' systems on the basis of objective performance data.
 
One of the field tests took place at a European EMS provider who manufactures circuit boards for industrial electronics equipment. Each board has approximately 1,000 components with a large proportion of ICs. The EMS started out with a basic line configuration consisting of two SIPLACE SX machines, each equipped with a SIPLACE MultiStar Collect & Pick & Place head. Shortly after making this investment, the EMS provider had to increase his throughput by 30 percent. With traditional systems, this would have required a major expenditure in additional equipment. With the SIPLACE SX, all he had to do was add another gantry to one of the machines. This gantry can be purchased or leased. With the added placement capacity from the new gantry and its additional 20-nozzle Collect & Place head, the SIPLACE line delivered more throughput and operated in a more balanced manner. Within a short period of time, the EMS provider was able to reduce his cost of ownership by an additional 30 percent compared with the original configuration.  
 
Example of a High Speed Production
Example of a Ganty Addition
Example of a Line Change
 

 
back
     


 
 

SIPLACE Newsletter

Our monthly newsletter brings the latest information directly to you.